Xue Wendong
     Zhang Ronghui
      Xu Jilong
     Huang Chaohui
      Luo Xingyuan
     Zhang Houxing
      Chen Deling
      Yang Nanru
      Zeng Yanwei
      Pan Zhihua
Path : Home >> Experts
PH.D Zhang Rong Hui

  PH.D and specialized in nonmetal and inorganic material

  President of Beijing Allied Rongda Engineering Material Co., Ltd

  Mobile: +86-13801066625

  Email: Perryrongda@sohu.com

  Curriculum vitae

  1.1981-1985 Study in Xian University of Architecture and Technology,Majored in Refractory, for Bachelor

     Degree.

  2.1985-1987 Work as an teacher in the university.

  3.1987-1990 Study in Nanjing University of Technology,Majored in Physi -chemistry of Material, for

     Master Degree.

  4.1990-1992 Work as a researcher in Beijing Research institute ofMetallurgy and Construction.

  5.Quit job in Nov., 1992 and establish my own first company—Beijing Rongda New material Co. Produce

     and sale unshaped refractories and high performance concrete to the customers of Iron and Steel

     Making industry.

  6.In 1996, turn the first company into the new company –Beijing Allied Rongda Engineering Material

     Co., Ltd. Till now the same products and same customers.

  7.And Now I have several branch companies located in different part of China.

  8.During the time from 1999 to 2005, I finished the study and researchcourses for my Ph.D in Beijing

     University of Science and Technology.

  Publications:

  1.High performance heat resistant concrete based on high alumina cement. [Ph degree paper].

  2.The progress on the technology for long life Blast Furnace.

  3.The development and application of porous mullite aggregate and high strength light weight castable.

  4.The analysis of the breaking behavior of roof hanger brick of he reheating furnace with flat hanging

     roof consist of two layers of lightweight and dense castable.

  5.The development and application of rapid heat up castable.

  6.The evelopment and application of no-heatup castable for construction of the runner of Blast Furnace

  7.The practice of reconstructing dry main trough of a BF with single taphole into iron store style

  8.Relining with robotic shotcrete for longer life of Blast Furnace.